tail end
英 [ˌteɪl ˈend]
美 [ˌteɪl ˈend]
n. 末尾; 末端; 尾端; 结尾部分
牛津词典
noun
- 末尾;末端;尾端;结尾部分
the very last part of sth- the tail end of the queue
队尾
- the tail end of the queue
柯林斯词典
- N-SING 结尾;收场
Thetail endof an event, situation, or period of time is the last part of it.- Barry had obviously come in on the tail-end of the conversation...
巴里显然是在谈话快结束时加入的。 - This is the tail end of the season.
这是季末的最后几天。
- Barry had obviously come in on the tail-end of the conversation...
英英释义
noun
- the fleshy part of the human body that you sit on
- he deserves a good kick in the butt
- are you going to sit on your fanny and do nothing?
- any projection that resembles the tail of an animal
- the time of the last part of something
- the fag end of this crisis-ridden century
- the tail of the storm
双语例句
- It was the tail end of monsoon season, and the air was heavy and sticky with tropic moisture.
正当季风雨季的最后几天,热带的湿潮空气又闷又粘。 - The Caribbean islands, which lie just beyond the tail end of the Windward Antilles, are a study in contrasts.
属加勒比海岛屿,那就是刚展现在远处的尾端的迎风的安的列斯群岛,是一个研究的对比。 - He was sitting around the house on his tail end.
他坐在房子的附近。 - He came at the tail end of the lecture.
他在讲座快结束时才来。 - The connecting body is cylindrical and provided with two threaded holes; the tail end of the drill pipe is arranged in the threaded holes.
所述连接体为圆柱形且设有两个螺纹孔,所述钻杆末端安装在所述螺纹孔中。 - I only saw the tail end of the TV news.
我只看到电视新闻的最后一部分。 - Technical Approach to Prevention of Longitudinal Spiral Eccentricity in Tail End of Cold-drawn Light-wall Seamless Steel Pipe
防止冷拔薄壁无缝钢管尾部产生纵向螺旋形壁厚不均的技术探讨 - The improvement of the hook includes that the tail end of the hook is connected with a perforation ball body and the hook can rotate in360 degrees taking the axis of the ball body as the shaft;
挂钩的改良为,在挂钩的尾端连接一个穿孔球体,挂钩可以以球体中轴线为轴360度转动; - All the good weather came at the tail end of our holiday.
到我们假期的末尾天气才好起来。 - At the tail end of the construction phase, the engineering team only had to fix defects that showed up in testing and update the remaining build and test documentation.
在构建阶段的末端,工程团队仅仅必须修改在测试和更新剩余的构建版本和测试文档中被显示的缺陷。